This program of the project is, the recipient will the one to provide the materials and the DA XI provided the manpower and technical. They drilled this well back in October 2023.
I never thought about the GI pipes and water reactions. The pipes is always submerged all the time and ended up like this in the photo, after 2 years.
I was disappointed with the connection, got rusted and my pump almost falling inside the well. Thanks be to God that God save me for spending too much.
God is really good. He protected our farm resources. Yes, my submersible pump is safe from falling.
As you see in the photo, he nipple got rusted and pump wont shoot up some water because of the hole. I have a great submersible pump but the nipple should be stainless too. I never thought of that. Now I know and so I am bringing stainless steel nipple from here... temporary GI nipple will be connected and change it later.
Lesson learned, water plus galvanized iron does not go together. Rust will attack the fittings.